
Texas Border Business
By Roberto Hugo González | Texas Border Business
WESLACO, Texas — Mayor Adrian Gonzalez said the City of Weslaco temporarily halted new development early in his administration to update construction standards requiring future projects to include stormwater retention and detention infrastructure.
In an exclusive interview, Gonzalez said the temporary moratorium was not intended to discourage investment but to ensure that future growth would not increase flooding in existing neighborhoods.
“We didn’t stop development to stop growth,” Gonzalez said. “We stopped it so we could update our building requirements.”
According to the mayor, Weslaco has experienced significant growth over the years as farmland has been replaced by commercial and residential development. He said the increase in paved surfaces has accelerated stormwater runoff, placing additional pressure on a drainage system originally designed for a much smaller community.
To address those challenges, the city revised its development standards to require new commercial projects to incorporate retention or detention ponds capable of storing stormwater before releasing it gradually into the municipal drainage system.
Gonzalez said the updated requirements are intended to ensure that future development contributes to the city’s long-term flood mitigation strategy rather than adding to existing drainage problems.
He explained that previous drainage infrastructure was designed to accommodate storms with recurrence intervals of approximately 15 to 20 years. As weather patterns have changed, the city is now planning infrastructure capable of managing 50- to 100-year storm events.
The mayor said managing growth responsibly requires balancing economic development with infrastructure investment.
According to Gonzalez, developers continue to express interest in Weslaco, and the city’s objective is to provide clear standards that protect existing residents while allowing new investment to proceed.
He said infrastructure planning extends beyond drainage and includes wastewater capacity, transportation improvements, and utility expansion needed to support continued population and commercial growth.
Gonzalez said the city is committed to making development decisions based on engineering analysis rather than short-term considerations.
He said requiring stormwater management infrastructure as part of new developments represents an investment in the city’s future and helps reduce the financial burden on taxpayers by ensuring private projects address their own drainage impacts.
The mayor added that long-term planning remains central to the city’s strategy as Weslaco continues to grow.
“Our responsibility is to prepare the city not only for today’s needs but for the next generation,” Gonzalez said.
This article is Part 5 of Blueprint for Weslaco, a Texas Border Business special report examining Mayor Adrian Gonzalez’s vision for infrastructure, growth and economic development through exclusive interviews.
See related stories:





























