loader image

- Advertisement -

Tuesday, January 13, 2026
64.1 F
McAllen
- Advertisement -

TRAFFIC ALERT- Minnesota Avenue Bridge Widening, Replacement Begins Jan. 19th 

Minnesota Avenue Bridge Replacement Starts Jan. 19; Completion Set for March 27

Translate text to Spanish or other 102 languages!

- Advertisement -
The Minnesota Avenue bridge, located between Starship Road and Zafiro Drive in Brownsville, is scheduled for demolition and replacement, starting Monday, January 19, 2026. Image courtesy of TxDOT
The Minnesota Avenue bridge, located between Starship Road and Zafiro Drive in Brownsville, is scheduled for demolition and replacement, starting Monday, January 19, 2026. Image courtesy of TxDOT
- Advertisement -

BROWNSVILLE – The Minnesota Avenue bridge, located between Starship Road and Zafiro Drive in Brownsville, is scheduled for demolition and replacement, starting Monday, January 19, 2026.

Minnesota Avenue bridge in Brownsville. The e will be a detour in place throughout the demolition and reconstruction period. Completion is set for March 27, 2026

The estimated completion date for the replacement bridge is March 27, 2026. The new bridge will be widened to include two 12-foot travel lanes (one in each direction) and a 5-foot shoulder along each travel lane.

A guided two-mile detour route has been designated for drivers via Norton Drive, Morning Side Road, Southmost Avenue and California Road. (See Map)

Courtesy image
- Advertisement -
- Advertisement -
- Advertisement -

Latest News

More Articles Like This

- Advertisement -